The application must be planned by authorized persons with a risk assessment specific to the business and equipment.
The Isolation Plan
Comparing single-line schemes, process flows and field labels, cuts, valves and blinding points are determined.
Multi-Team Coordination
Operations, electrical, mechanical and supplier teams are managed by the joint license and group LOTO system.
Don’t give energy back.
Isolations are removed in reverse order and with authorized approval. Line filling, pressure and synchronization risks are also controlled.
The next step in the application
Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.
LOTO project and supply scope for energy production
Production equipment, assistant facilities and electricity distribution system for the LOTO range of power plants are listed separately. The maintenance cards of the pumps and fans are linked to current schemes. Special technical methods for the plant and high voltage work are determined by the authorized team of the operator; the general product catalogue does not provide this work authority or method.
Special field discovery and visual instructions to the sector, Applied ECED Training and The training simulator You can select the scope for separately Share equipment list, maintenance work, isolation point photos and participant roles.
Get product selection, discovery, procedure, training and simulator support from one point.