List of machines, electricity, pressure, movement and other energy sources; insulation points and record of existing applications.
Request the right LOTO solution
Choose products, simulators, training, consulting or digital solutions. We can define the scope around your existing equipment and factory department.
Review the message in WhatsApp or your email app before sending. Price, equipment scope and delivery time are confirmed in the quotation.
The first step when installing the LOTO system in the factory is to identify the machines and energy points before determining the number of locks. The Loto Partner deals with the interconnected parts of the installation from field discovery to visual instructions, product selection and training plan.
The LOTO Consultancy
The general energy control procedure of the company is to prepare visual instructions with a photo number specific to the machine.
Selection of the equipment according to the scale of the switch and valve; personal lock, field lock, group box, label and station needs assessment.
How is the project going forward?
- The cover: Facilities, number of machines, departments, maintenance work and existing records are determined.
- The Envanter: Energy sources, separation points and equipment photos are recorded.
- The draft: The tasks, the process order, group work and turn rules are documented.
- Confirmation of field: Design instructions and product candidates are assessed on the site by the authorized team of the facility.
- Training and Delivery: The document, product list, training and review process is completed through the approved scope.
Which of the proposals are included?
| It came out | The content |
|---|---|
| Energy point inventory | Machine, type of energy, isolation point and photo recordings. |
| General Procedure | Roles, record arrangement, personal and group application, wardy and tacheron coordination. |
| Visual instructions | Specific stop, isolation, lock, verification and activation order for the machine. |
| List of product needs | Depending on the size and environment of use, apparatus, lock, label and station candidates. |
| Education and Revision Plan | Participant profile, application scope and tracking changes. |
Whether each output is included or not, the number of machines and the scope of the discovery are clearly indicated on the offer.
Digital guidance and audit management
Businesses who want to manage visual instructions with QR access, approval and review flow DigiPartnerPro The software scope, users and the recording structure to be used are also determined.
Starting information for the search request
The facility's number, industry, machine list or approximately the number of machines, energy types and existing LOTO application are sufficient for the start. having a product in your hand does not eliminate the need for advice and training; the conformity of the existing equipment is also assessed within the project framework.
Frequently Asked Questions
Is one procedure enough for all machines?
The general procedure explains the common rules. Energy sources and separation points require a specific instructions and verification method of equipment for different machines.
Do you need to purchase products in advance?
First, energy points and physical measurements are determined. existing products are checked and missing or incompatible equipment is also listed.
Technical reference is: OSHA 29 CFR 1910.147The scope of application is determined by the power sources of the facility and the authorized team.
Share your facility, machine and participant information.