The application must be planned by authorized persons with a risk assessment specific to the business and equipment.

Preparation and Notification

Authorized employees must know the types of energy, size, hazards and control methods. The workers affected are informed about the cause of work and interruption to be done before the machine is stopped.

Isolation and Verification

The machine is stopped by the normal method. Energy separation devices are taken to a safe location, personal locks and labels are applied. Stored energy is removed. Controls are seen in a neutral position and isolation is verified with an operation test or appropriate testing device.

Removing the lock

The general rule is that the locker employee removes his own lock. Exceptional removal procedures require a written, authorized and registered special procedure. The fields and employees are checked before re-starting.

The next step in the application

Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.

Set up a LOTO Sistemi that is suitable for you.

Get product selection, discovery, procedure, training and simulator support from one point.

Get information and offer