The application must be planned by authorized persons with a risk assessment specific to the business and equipment.

Critical equipment

Brokers, bands, miners, fan, elevators and rotating oven assistant systems are assessed on the machine basis.

Stored energy

It is expected to stop the turn parts, support upgraded equipment, pressure discharge and temperature fall to a safe level.

Coordination

The central command, the field operator, the maintenance and carrier teams are defined between permission, notification and group LOTO flow.

LOTO project and offer coverage for cement

The machine numbers of assistant drivers in the steam, crushing and fan maintenance are associated with the main equipment. MCC panel information for the LOTO project of the cement factory is collected together, field separator photo, valve measurements and planned position range. Group lock box capacity in long stands is assessed by the participation of the maintenance, electricity and carrier teams.

Special field discovery and visual instructions to the sector, Applied ECED Training and The training simulator You can select the scope for separately Share equipment list, maintenance work, isolation point photos and participant roles.

Check out the LOTO guides from other sectors.

The next step in the application

Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.

Set up a LOTO Sistemi that is suitable for you.

Get product selection, discovery, procedure, training and simulator support from one point.

Get information and offer