The application must be planned by authorized persons with a risk assessment specific to the business and equipment.
Map the many foods.
The network, generator, UPS output, battery series, transfer panel and the possibility of backfeeding should be examined along with a single line scheme. Control circuits and remote start signals must also be added to the storage.
Stop the automatic operation.
The power separation devices are brought to the appropriate location, locked and labelled; battery connections are managed according to the manufacturer's instructions.
Confirmation of Uninterruption
The appropriate measurement device is tested at the first known energy point, it is measured at the work point and the device is re-controlled.
The next step in the application
Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.