The application must be planned by authorized persons with a risk assessment specific to the business and equipment.

Before Starting Work

The scope of the work, energy sources, authorized persons and facility rules are mutually explained. Taşeron employees' training and competencies are verified.

Personal protection

Each authorized employee controls his own unique lock. The facility or team leader lock does not replace the employee's personal lock.

Closing and Registration

At the end of the work, staff, tools, protectors and locks are checked. The participation of the tacheron, turns and incompatibilities are recorded.

The next step in the application

Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.

Set up a LOTO Sistemi that is suitable for you.

Get product selection, discovery, procedure, training and simulator support from one point.

Get information and offer