The application must be planned by authorized persons with a risk assessment specific to the business and equipment.

Rules at the program level

The purpose, scope, definitions, authorized and affected employee roles, training, audit, contractor, group work, wardy exchange and exceptional lock removal rules are determined.

Instructions based on machine

For each equipment, the stop order, energy types, separation points, lock product, stored energy removal, verification and safe start steps are shown by photographs.

Revision and Audit

When the equipment changes, when an incident or disadvantage occurs and the procedure is updated according to the results of periodic audits. Old versions are archived in a controlled manner.

The next step in the application

Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.

Set up a LOTO Sistemi that is suitable for you.

Get product selection, discovery, procedure, training and simulator support from one point.

Get information and offer