The application must be planned by authorized persons with a risk assessment specific to the business and equipment.
The advanced indicators
The completed energy reserve, current machine instructions, training qualifications and the performance rate of planned audits are monitored.
The results indicators
LOTO disadvantages, ramping events, unauthorized lock removal and repeated findings are considered as a trend.
The management review
Indications are dealt with on the basis of department and equipment; they are converted into source, training and procedural decisions.
The next step in the application
Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.
Get product selection, discovery, procedure, training and simulator support from one point.