The application must be planned by authorized persons with a risk assessment specific to the business and equipment.
The policy of
Maintenance, cleaning, setting, installation and failure fixing work must be defined in terms of employees, carriers and visitors' teams. Electrical, mechanical, hydraulic, pneumatic, thermal, chemical and land-tracking resources should be dealt with together.
The basic rules
Each authorized employee controls his own personal lock. Lock and labels cannot be removed without permission. Group LOTO is applied to the work in which more than one person works. After the energy is separated, stored energy is removed and zero energy status is verified.
Monitoring and healing
The policy is completed by tasks, training, periodic inspection, failure management, wardy transfer and exceptional lock removal processes. Documents and training are updated when equipment or process changes.
The next step in the application
Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.
Get product selection, discovery, procedure, training and simulator support from one point.