The application must be planned by authorized persons with a risk assessment specific to the business and equipment.

Program control

Policy, tasks, training, contractor rules, group LOTO and exceptional lock removal process are reviewed in terms of up-to-date.

The observation area

Energy points, the right selection of equipment, personal lock use, stored energy control and zero energy verification are observed.

Repairing activities

Responsible for the findings, the term and verification method is assigned. Repeated incompatibilities require training, equipment or procedure change.

The next step in the application

Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.