The short answer: In pharmaceutical factories, LOTO is planned with the requirements for hygiene, product integrity, contamination control and process validation while ensuring workers' safety. The energy limits of clean rooms, CIP/SIP, mixers and filling lines must be clearly defined.

Which systems will be evaluated together?

Electric, pneumatic, pure steam, process steam, hot water, vacuum, pressure gas, automation and mobile equipment can create multiple energy sources for the same maintenance work.

What is the risk during CIP/SIP?

Automatic valve orders, temperature, pressure and chemical circulation can enter unexpected action. maintenance mode, valve insulation and automation power are supported by physical LOTO.

Does the condition of hygiene affect product choice?

Yes. Cleansability, chemical resistance, particle risk and entry rules to the controlled area are taken into account. The locks and labels are selected in accordance with the rules of the production area.

How is the document managed?

The specific instructions for the machine, change control, maintenance recording and re-production control are associated with the quality system.

What does Loto Partner provide for your business?

Loto Partner plays field discovery, energy point inventory, correct LOTO/EKED product matching, machine-specific procedures and visual instructions, applied training, LOTO simulator and DigiPartnerPro digital tracking solution according to the real risks of the business.

Technical reference

LOTO project and offer coverage for medicine

In the laboratory of pharmaceutical factory EKED, granulation, tableting, filling and technical assistant systems are monitored with separate records. maintenance work resulting from product or format change is included in the instructions scope. The review of the visual instructions of the machine and the review of the quality document are clearly defined by the responsible team and approval flow because there are different records.

Special field discovery and visual instructions to the sector, Applied ECED Training and The training simulator You can select the scope for separately Share equipment list, maintenance work, isolation point photos and participant roles.

Check out the LOTO guides from other sectors.

Create a LOTO Sistemi that is suitable for your business.

Get information for product, discovery, procedure, training, simulator or digital tracking.

Contact us →