The application must be planned by authorized persons with a risk assessment specific to the business and equipment.

Priority

Critical machines are determined according to maintenance frequency, energy diversity and the potential of accident. The pilot field is selected and the standard is developed.

Installation components

Policy, energy storage, machine instruction, appropriate equipment, training, group LOTO and recording system are established together.

not spreading

After the pilot results are verified, it is applied to other lines. with controls and change management, the system is kept up-to-date.

The next step in the application

Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.