The application must be planned by authorized persons with a risk assessment specific to the business and equipment.

What records should be kept?

Current LOTO policies, machine-based instructions, energy point inventory, training and evaluation results, periodic audits, work permissions, group LOTO and wardy turn records should be managed together.

Role in the investigation of the incident

It can be studied through records of what energy sources are determined after an event or rampe, who is the isolation, how verification is carried out and whether changes are managed or not.

Avoid the wrong certainty

Buying a product alone or signing a form does not guarantee legal conformity. Responsibility is assessed according to the circumstances of the concrete event, the applicable legislation and how the practice is actually done; if necessary, it must be consulted by law and ISG experts.

The next step in the application

Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.

Set up a LOTO Sistemi that is suitable for you.

Get product selection, discovery, procedure, training and simulator support from one point.

Get information and offer