The application must be planned by authorized persons with a risk assessment specific to the business and equipment.

Before Starting Work

The work scope, equipment, authorized persons and affected employees are determined. the current machine instructions are opened; all types of energy, isolation points and necessary lock equipment are checked.

During the isolation

The machine is stopped by the normal method. Energy separation devices are shut down, personal locks and labels are applied, stored energy is removed and controls are taken to a neutral position.

Work and not activate.

Try-out or the appropriate measurement method of zero energy is verified. at the end of the work, the field, protectors and employees are checked; the locks are removed by the owners and after notification the energy is returned.

The next step in the application

Field data should be evaluated together for the photography of energy points, the identification of appropriate lock equipment and preparation of machine-based instructions.