This guide is for maintenance planning and the scope of the offer. The isolation method to be applied in the field is determined by the manufacturer's documents and the authorized technical team of the enterprise.
Data center and telecom facility LOTO cover
In data centers, UPS can complicate the maintenance scope of the generator and multiple power routes. Data center LOTO project planned with continuity targets and maintenance limits together; a general product list does not replace the approved work plan of the electric system.
What information is taken into the equipment inventory?
| Equipment Group | Inspected in the discovery file |
|---|---|
| UPS and Distribution Panels | Food routes, bypass relationships and current single line scheme |
| Generator Assistant | Automatic command sources and maintenance managers |
| The cooling systems | Equipment records of the pump, fan and joint lines |
This table shows the start examples. a equipment coverage that is not included in the facility is not added; separate records are prepared for machines with different connections.
Special procedure and visual instructions for the sector
The starting file includes current electric schemes, equipment numbers and changes records. Battery and DC circuits should not be displayed under the name of the AC panel alone. Electric verification and special working methods are determined by the authorized electric team of the facility.
How are the lock products matched?
The product selection is made through the list of approved energy points. Lock and Insurance The distinctive model; in the locks The size of the arm and body; Pneumatic connection locks The link type is checked. the lock and tag are indicated in the offer file according to the unit, tasks and values.
Training and project proposals for Data Center and Telecom
Applied ECED Training Share the maintenance tasks and participant roles for. Equipment settings, number of participants and scenarios after clarified Fixed or portable simulator The supply of products, field discovery, instruction preparation and training costs can be compared with separate scope.
- List of machines, field numbers and manufacturer maintenance documents.
- Photos of energy points, distinctor and valve measurements.
- Planned maintenance works, vardias and the contractor's participation.
- Available LOTO products, instructions and training records.
Frequently Asked Questions
What information do you need for a dual-food system?
The current scheme that shows each feed path, bypass and automatic transfer relationships is required. Physical distinctive positions and maintenance work are recorded together.
Technical Reading : Official maintenance and energy control sourceThe scope and sectoral differences of foreign resources are not transferred directly to the field application in Turkey as a legislative provision.
Start with equipment list, maintenance work and energy point photos.