This guide is for maintenance planning and the scope of the offer. The isolation method to be applied in the field is determined by the manufacturer's documents and the authorized technical team of the enterprise.

Ceramic and rubber in the LOTO

Preparation, pressing, drying and shipping lines in ceramic, crane and rubber production include different energy sources. The ECED plan of the ceramic factory is prepared according to the maintenance limit of each unit in the production flow. With the record of the press unit, the record of the dryer fan is not used instead of each other.

What information is taken into the equipment inventory?

Equipment GroupInspected in the discovery file
Press and the area.Hydraulic unit, moving parts and shape maintenance limit
Melting and mixersMain drives, assistant foods and material connections
Drying and transportationFan, carriers and common process lines

This table shows the start examples. a equipment coverage that is not included in the facility is not added; separate records are prepared for machines with different connections.

Special procedure and visual instructions for the sector

Shape change, cleaning and fan maintenance are taken in the storage as separate work examples. The way of access to equipment as far as distinctive position should be indicated in photos. If multiple press or lines are powered by the same assistant system, the relationship is recorded on the machine card.

How are the lock products matched?

The product selection is made through the list of approved energy points. Lock and Insurance The distinctive model; in the locks The size of the arm and body; Pneumatic connection locks The link type is checked. the lock and tag are indicated in the offer file according to the unit, tasks and values.

Training and project proposals for ceramics and roof

Applied ECED Training Share the maintenance tasks and participant roles for. Equipment settings, number of participants and scenarios after clarified Fixed or portable simulator The supply of products, field discovery, instruction preparation and training costs can be compared with separate scope.

Frequently Asked Questions

How to choose a LOTO set for ceramic press?

The equipment measurements are determined according to the pressin model and real isolation points. The name of the ready set does not indicate conformity alone; the switch, valve and lock requirements are matched separately.

Technical Reading : Official maintenance and energy control sourceThe scope and sectoral differences of foreign resources are not transferred directly to the field application in Turkey as a legislative provision.