The short answer: The LOTO field control form should not consist only of the “compatible/non-compatible” boxes. It must link equipment, business, employees, procedure review and actual field observation; it must also include the responsible for non-compatibility, deadline date and closing proof.

What should be in identity areas?

The facility, department, machine code, business order, date-time, teams, authorized staff, observers and the revisions of the procedure used are recorded.

What steps are observed in the field?

Notification, normal stop, all energy sources separation, personal locks and labels, stored energy control, try-out or measurement and work area limits are assessed.

How to classify inadequacy?

Other deviations are recorded by the risk level, responsible and deadline; adding a photo alone is not closed.

How to close the form?

The regulatory activity is verified in the field, proof is added and closed by the authorized person. Repeated findings require training or system change.

What does Loto Partner provide for your business?

Loto Partner plays field discovery, energy point inventory, correct LOTO/EKED product matching, machine-specific procedures and visual instructions, applied training, LOTO simulator and DigiPartnerPro digital tracking solution according to the real risks of the business.

Technical reference

Create a LOTO Sistemi that is suitable for your business.

Get information for product, discovery, procedure, training, simulator or digital tracking.

Contact us →