This guide is for maintenance planning and the scope of the offer. The isolation method to be applied in the field is determined by the manufacturer's documents and the authorized technical team of the enterprise.

Lotto and rubber in the Lotto

The rubber preparation, scaling and volcanization lines have different maintenance tasks under the same name. Electric drives, pressure systems and hot process connections are associated with separate records in the ECED plan of the tyres factory.

What information is taken into the equipment inventory?

Equipment GroupInspected in the discovery file
Mixed and mercuryIdentification of the Tahrik, Nutrition and Accessed Section
Vulkanization pressPressure and hot process connections
Transfer and YellowSeparate engines, pneumatic connections and neighboring units

This table shows the start examples. a equipment coverage that is not included in the facility is not added; separate records are prepared for machines with different connections.

Special procedure and visual instructions for the sector

When preparing the machine card, the cleaning of the roof and press-in-house maintenance are defined as different tasks. The position of the protective door is recorded as separate information without replacing the machine separator. In hot or pressure processes, the control points determined by the specialist team of the operator are processed in order.

How are the lock products matched?

The product selection is made through the list of approved energy points. Lock and Insurance The distinctive model; in the locks The size of the arm and body; Pneumatic connection locks The link type is checked. the lock and tag are indicated in the offer file according to the unit, tasks and values.

Training and project proposals for rubber and tyres

Applied ECED Training Share the maintenance tasks and participant roles for. Equipment settings, number of participants and scenarios after clarified Fixed or portable simulator The supply of products, field discovery, instruction preparation and training costs can be compared with separate scope.

Frequently Asked Questions

How to personalize training on the rubber line?

The tasks of the production, mechanical maintenance and electrical maintenance teams are addressed by different examples. The application chosen for training is matched with the authentic instructions of the real machine and the authority limit of employees.

Technical Reading : Official maintenance and energy control sourceThe scope and sectoral differences of foreign resources are not transferred directly to the field application in Turkey as a legislative provision.