This guide is for maintenance planning and the scope of the offer. The isolation method to be applied in the field is determined by the manufacturer's documents and the authorized technical team of the enterprise.

Lotto in wood and furniture facilities

In the wood processing facilities, central absorption, press and automatic feeding systems as well as cutting machines can enter the maintenance scope. Furniture Factory LOTO plan is prepared according to the connections of each machine without acceptance of a single electric fixture.

What information is taken into the equipment inventory?

Equipment GroupInspected in the discovery file
Processing and CNC processingMachine separator, assistant engines and work unit
Press and side bandageMovement mechanisms, air connections and hot parts
The powder emitting systemConnections to common fan, damper and other machines

This table shows the start examples. a equipment coverage that is not included in the facility is not added; separate records are prepared for machines with different connections.

Special procedure and visual instructions for the sector

In the discovery list, central systems are divided into independent machines. Cutting equipment replacement, channel cleaning and press maintenance are written as separate tasks. The material, coating and conditions of use of the product in a dust environment are assessed according to the technical documentation of the product.

How are the lock products matched?

The product selection is made through the list of approved energy points. Lock and Insurance The distinctive model; in the locks The size of the arm and body; Pneumatic connection locks The link type is checked. the lock and tag are indicated in the offer file according to the unit, tasks and values.

Training and project proposals for wood and furniture

Applied ECED Training Share the maintenance tasks and participant roles for. Equipment settings, number of participants and scenarios after clarified Fixed or portable simulator The supply of products, field discovery, instruction preparation and training costs can be compared with separate scope.

Frequently Asked Questions

Why is the central absorption system recorded separately?

It can be connected to a number of manufacturing machines, and it is impossible to create a range with the name of the machine without knowing which part of maintenance is done and which connections are affected.

Technical Reading : Official maintenance and energy control sourceThe scope and sectoral differences of foreign resources are not transferred directly to the field application in Turkey as a legislative provision.

Find the appropriate area for your business.

Start with equipment list, maintenance work and energy point photos.

Get information and offer