The short answer: Try-out test is a attempt to verify that the machine does not work with normal start control after lock. It is an important check, but it doesn't go alone instead of electrical measurement, pressure control or stored energy examination.
What to do before the test?
Workers are withdrawn from the dangerous area, energy separation points and personal locks are checked.The test is confirmed that it will not create unexpected movements.
How is the test performed?
The normal start command is tested in a short and controlled manner. the machine should not react. After the test, the commands are stopped or returned to a neutral position.
Why is it not enough alone?
Control circuit failure may not run the machine; however, there can be dangerous voltage in the main circuit. Pressure, heat, landing and condensator energy may also not be understood by the start attempt.
How is the result recorded?
The specific instructions for the machine are written in the verification method and acceptance criteria. The person who applies to critical work, date and result can be recorded digital or printed.
What does Loto Partner provide for your business?
Loto Partner plays field discovery, energy point inventory, correct LOTO/EKED product matching, machine-specific procedures and visual instructions, applied training, LOTO simulator and DigiPartnerPro digital tracking solution according to the real risks of the business.
Technical reference
Get information for product, discovery, procedure, training, simulator or digital tracking.